Home > Blog > Selling a Columbia Home With Unapproved Exterior Changes

Selling a Columbia Home With Unapproved Exterior Changes

If you are selling a Columbia home with a covenant violation, like a deck, fence, shed, or door color that never got village approval, you can still sell. The fix is usually an after-the-fact Exterior Alteration Application to your village’s Resident Architectural Committee, filed early enough that it never touches your settlement date. Most unapproved changes that are in good condition and meet current guidelines can be approved retroactively, but you need to start before you list, not after you ratify.

I see this on a lot of Columbia listings. The owner built a deck in 2009, never thought about it again, and it surfaces when the buyer’s agent asks for a Letter of Compliance. Here is how I handle it.

Why do Columbia covenants follow the house when you sell?

Columbia’s architectural covenants run with the land. That means whoever owns the home is responsible for any violation, no matter who created it.

  • Hickory Ridge Village puts it plainly: violations “run with the property,” and buyers may be asked to fix a prior owner’s violation.
  • Town Center’s covenant FAQ advises every buyer to request a Letter of Compliance at settlement.
  • An updated Letter of Compliance will not be issued while a violation exists.

So a savvy buyer, or their agent, will ask for that letter. If you have an open violation, you will not get it, and the question becomes who fixes it and when.

What counts as an unapproved exterior change?

Anything that changes how your property looks from the outside generally needs prior approval from your village. Common ones I run into:

  • Decks, patios, and screened porches
  • Fences and gates
  • Sheds and play structures
  • Replacement windows, doors, or siding in a different color or style
  • Solar panels, storm doors, and exterior lighting changes
  • Tree removal or major landscaping changes

If you are not sure whether something was approved, call your village office. They keep property files and can tell you what is on record.

How do I get retroactive approval in Columbia?

The path looks like this:

  • Request your property file from your village office to see what was approved.
  • Submit an Exterior Alteration Application for anything missing, with photos, a site plan, and materials and colors.
  • Attend the Resident Architectural Committee meeting if your village requests it.
  • Request a Letter of Compliance inspection once approvals are in hand.

Hickory Ridge says an unapproved feature found during a resale inspection must be applied for, and if it is in good condition and meets current guidelines, it “will likely be approved after the fact.” Town Center notes its committee does not favor or penalize an application because the work is already done.

If the committee denies it, you may be required to modify or remove the change. Denials can be appealed through the village’s Covenant Advisor. Unresolved violations can eventually be referred to the Columbia Association’s Architectural Resource Committee, which can pursue enforcement.

How long does approval take before settlement?

This is where sellers get burned. Committees meet on a schedule, and you cannot rush them.

  • Hickory Ridge’s committee meets on the first and third Wednesday of each month, and reviews applications submitted by the deadline about 15 days later.
  • Town Center says its full review usually takes 3 to 4 weeks at most.
  • Long Reach recommends requesting a Letter of Compliance at least 60 days before settlement.

Sources: Hickory Ridge Village Covenant FAQs, Columbia Town Center Covenant FAQ, Long Reach Village Buying and Selling page, Columbia Association ARC page; all reviewed November 2026. Processes vary by village, so confirm with yours.

My rule: if I am listing a Columbia home, we pull the village file and request the compliance inspection before the photographer shows up. That gives us a 30 to 60 day head start on anything that needs approval.

Should I disclose an unapproved change to buyers?

Yes. If you know about it, disclose it. Hiding a known violation creates risk for you and kills trust the moment the buyer’s agent finds it, and they usually do.

How you frame it matters. “Deck built 2009, after-the-fact application submitted, committee review scheduled for the 18th” reads very differently than a surprise letter from the village two weeks before closing.

How do I negotiate with a buyer if approval is still pending?

You have a few options, and I pick based on the size of the issue and the timeline:

  • Get it approved before listing. Cleanest path, and my strong preference.
  • Commit in the contract to obtain approval by a date before settlement.
  • Offer a credit or escrow at settlement to cover a likely modification if timing is tight.
  • Remove or correct the item if it clearly will not meet guidelines.

What I avoid is letting the issue float without a written plan. Buyers’ lenders and title companies do not like loose ends, and neither do buyers.

What is the bottom line for Columbia sellers?

An unapproved deck or fence is a paperwork problem, not a deal killer, as long as you handle it on your timeline instead of the buyer’s. Start with the village office, file early, and get the Letter of Compliance in hand before you list.

If you are planning a sale and want me to walk through your village file with you, start with our Columbia community guide or reach out through Team Alpha Charlie of Douglas Realty.

Have you ever had a covenant issue pop up during a Columbia sale? Tell me how it played out in the comments.

Columbia Covenant Violation FAQ

Can I sell my Columbia home with an open covenant violation?
Yes, you can legally sell. But the violation transfers with the property, and many buyers will request a Letter of Compliance that the village will not issue while a violation is open. That usually means you resolve it or negotiate it before settlement.

What is a Letter of Compliance in Columbia?
It is a letter from your village confirming that, at the time of inspection, no covenant violations were found. It is not legally required, but villages and buyers’ agents strongly recommend it, and it protects the buyer from inheriting your problems.

How long does a retroactive approval take?
Typically several weeks, depending on your village’s meeting schedule and submission deadline. Some villages review twice a month; others note a full review can take up to 3 to 4 weeks. Build in 60 days before settlement to be safe.

What if my village denies the after-the-fact application?
You may need to modify or remove the change to meet the guidelines. You can appeal through the village Covenant Advisor. If it remains unresolved, the matter can go to the Columbia Association’s Architectural Resource Committee for enforcement.

Who pays to fix a covenant violation at resale?
That is negotiable. Often the seller fixes it or obtains approval before settlement, but a credit or escrow can work if timing is tight. Put whatever you agree to in writing in the contract.

Do I need to tell my agent about changes I made without approval?
Yes, and as early as possible. The earlier I know, the more options we have, and the less likely it is to surface as a surprise in the middle of your contract.

I am Adam Chubbuck, Team Leader of Team Alpha Charlie of Douglas Realty. Retired U.S. Navy Chief, licensed in Maryland and Virginia, and my team has sold in excess of 400 homes across the Baltimore to Annapolis corridor. Team Alpha Charlie is Zillow Preferred and serves buyers and sellers throughout Anne Arundel County, Howard County, Baltimore County, Baltimore City, and the surrounding markets, with deep experience supporting military, veteran, and Department of Defense families.

443-347-6692 | [email protected] | TACMD.com

Smile more,
Adam Chubbuck

BACK TO COLUMBIA, MD

Recent Posts

Send us
a message

    Skip to content